Bear Creek- Mill Branch Mitigation Bank

The Bear Creek- Mill Branch Mitigation Bank is a 145-acre site constructed in 2001. The site was restored from ditched and drained crop land to a Cypress-Tupelo Swamp and Bottomland Hardland Forest. This restoration was performed by Restoration Systems.